University of Houston UHCL Clear Lake Dr. Mohammad A. Rob, CAPM
Systems Analysis & Design
Syllabus:
Fall 2017 TA Information: Abhishek
Group Project: Presentation Schedule-Fall 2017
Project Documentation Requirement
Sample Group Projects
Database Background:

Database Assignment,Sample Answer, Another Sample
Monarch Software, Special Event, Equipment Tracking
Research Paper: Job of a Systems Analyst

IEEE Guidelines for Writing Research Papers
Sample paper One;
Sample paper Two
Sample Dr. Rob’s Paper

Uploading Files:

Password Reset:

Using FTP to upload Files

Password Reset
Test Outlines (ISAM 4635): ISAM 4635 Test-I Outline
ISAM 4635 Test-II Outline
Sample Final Test

Test Outlines (ISAM 5635): ISAM 5635 Test-I Outline
ISAM 5635 Test-II Outline
ISAM 5635 Test-III Outline

LECTURES RESOURCES
INTRODUCTION

Systems Development Life Cycle
;
SDLC Activities
Spiral Model; Prototyping

RAD; Rational Unified Process
PHASE-I: SYSTEMS PLANNING

Team Forming/AgreementStatement of Understanding

Preliminary Investigation
Project Management - PowerPoint Presentation

Prelimanay Investigation Report (Major Output)

Project Management Definition; Project Management Lecture

Software Size Estimation One
; Software Size Estimation Two

Dr. Rob's Paper1
; Dr. Rob’s Paper2

PHASE-II: SYSTEMS ANALYSIS

Team Processes: Mission Statement, Roles and Rules


Systems Requirements
Use-Case Analysis

Data-Flow Diagrams - PowerPoint Presentation
Data Dictionary
Process Description - html version
Data Modeling (An Example)
Alternate Solutions to Sysetms Development
System Proposal (Major Output)
Data-Flow Diagram Rules

Dr. Rob's Paper
PHASE-III: SYSTEMS DESIGN

Team Self-Assessment: Self Analysis Document

Relationship Between Analysis & Design
Systems Design Overview
Make or Buy Decision
System Architecture; Architecture Design
User Interface Design
Choice of File or Database; Database Design
Program Design
Design Specification (Major Output)
 
PHASE-IV: SYSTEMS IMPLEMENTATION

Team Peer Evaluation: Take the Survey

Software Quality Assurance
Application Development
Installation and Evaluation
The Completed System (Major Output)
Software Quality Assurance and Testing

Risk Management

Capability Maturity Model

PHASE-V: SYSTEMS MAINTENANCE

Operations and Support
 
   

INTRODUCING OBJECT-ORIENTED ANALYSIS & DESIGN

Introduction
Functional Modeling: Use-Case Diagrams; (pdf  version)
Structural Modeling: Class Diagrams; (pdf version)
Behavioral Modeling: Sequence, collaboration & Statechart Diagrams; (pdf version)